Read asCoordinator298 of 298 projects

Projects

298

298 in the portfolio

Approved

118.912

k€

Forecast

123.084

k€, +4172 against approved

Status

as set by the manager
On track263
At risk14
Blocked1
On hold20

What somebody decided. The dates can disagree — 15 are past a gate.

Progress

% complete
0%253
1–25%1
26–50%12
51–75%15
76–100%17

0% is where a project sits until somebody plans it in detail.

Phase

where they stand
Initiation89
Definition5
Preparation20
Execution109
Close-out75

The further along the gate line, the stronger the bar.

Per coordinator

18 people · click a name to filter
NameProjectsPast gateWaitingApprovedForecastΔ
1812277468056+310
1712565646701+137
17—2258605860—
1711889229676+754
1711849964996—
1712273717723+351
1712056615661—
17—2454115446+36
1711856995761+62
16122984512.328+2483
16—2454175417—
1612299919991—
16—2654435448+4
1611865276527—
1611853215321—
16—1857145714—
1631872037238+35
1611452225222—

Past its gate

15 projects
  • PRJ-0229Level measurement replacementExecution2228d
  • PRJ-0230Camera system replacementExecution1488d
  • PRJ-0136TK 0803: (Out-of-service) inspection & TTARExecution219d
  • PRJ-0091Nitrogen blanketingExecution211d
  • PRJ-0024Renovation marine loading armsClose-out103d
  • PRJ-0057Preventive maintenance backlogExecution85d
  • PRJ-0038Crane overhaulClose-out50d
  • PRJ-0237TK 703 - bottom plate renewalPreparation43d
  • PRJ-0045Loading arm renovationClose-out39d
  • PRJ-0107Tank cooling (and fire extinguishing) systemsExecution26d
  • PRJ-0036Preventive maintenance backlogClose-out15d
  • PRJ-0273Painting and coating programmeClose-out15d
  • PRJ-0231Operating computer replacementClose-out8d
  • PRJ-0047On-site pipeline inspectionExecution1d
  • PRJ-0143Tk 1806: (Out-of-service) inspection & TTARPreparation1d

Projects

298 in this cut
  • PRJ-0229Level measurement replacementExecution0%
  • PRJ-0001Pump overhaulClose-out0%
  • PRJ-0149Replacement SCADA / PLCExecution0%
  • PRJ-0148Replace flowmeter/computer LP7Execution0%
  • PRJ-0003Water treatment phase 1 HAZOP actionsExecution70%
  • PRJ-0004Off-site pipeline inspection off-site lineExecution0%
  • PRJ-0230Camera system replacementExecution0%
  • PRJ-0005Motor control centre replacementExecution0%
  • PRJ-0002Tank 2101: Inspection + Repair +MaintenanceClose-out100%
  • PRJ-0006E Drawings & Contractor housingExecution0%
  • PRJ-0008Maintenance activities offices and buildingClose-out0%
  • PRJ-0026Replacement MOV actuators 2018Execution0%
  • PRJ-0007Gas detection installationExecution0%
  • PRJ-0232Replacement MCC's pump roomsClose-out0%
  • PRJ-0010Reparaties schuim en sprenklerleidingenExecution0%
  • PRJ-0233Low-voltage distribution cabinet replacementExecution0%
  • PRJ-0009Reparaties manifoldsExecution0%
  • PRJ-0231Operating computer replacementClose-out0%
  • PRJ-0022Mechanical modifications during TTARClose-out0%
  • PRJ-0012Sewer renovationExecution0%
  • PRJ-0029Preventive maintenance backlogClose-out0%
  • PRJ-0152Hydrant replacementClose-out100%
  • PRJ-0156Cable tray renewalExecution0%
  • PRJ-0161On-site pipeline maintenanceClose-out0%
  • PRJ-0171Pipework replacementExecution0%
  • PRJ-0245Tank cooling (and fire extinguishing) systeClose-out0%
  • PRJ-0246Thermische expansie tankleidingenClose-out94%
  • PRJ-0027Lighting replacementExecution0%
  • PRJ-0034Tank cooling (and fire extinguishing) systeClose-out0%
  • PRJ-0028Cable tray renewalExecution0%
  • PRJ-0158Fire proofing of structuresClose-out100%
  • PRJ-0166Camera system replacementExecution40%
  • PRJ-0038Crane overhaulClose-out0%
  • PRJ-0020Cable tray renewalClose-out100%
  • PRJ-0151Fire water pump repairExecution0%
  • PRJ-0024Renovation marine loading armsClose-out0%
  • PRJ-0167Lifting equipment inspectionClose-out0%
  • PRJ-0235Lighting replacementClose-out0%
  • PRJ-0018Oxygen monitoring installationDefinition0%
  • PRJ-0165Loading arm renovationPreparation0%
  • PRJ-0150Camera system replacementExecution0%
  • PRJ-0159Cathodic protection upgradeClose-out0%
  • PRJ-0238Off-site line inspectionClose-out0%
  • PRJ-0011Fire water pump repairClose-out0%
  • PRJ-0147Ensure reliable waste water processExecution0%
  • PRJ-0236Cable tray renewalExecution0%
  • PRJ-0244Pit 6 N2 incl. permanente zuurstofbewakinExecution0%
  • PRJ-0155Foundation repairsClose-out0%
  • PRJ-0014Fire proofing of structuresDefinition0%
  • PRJ-0021Jetty repairClose-out60%
  • PRJ-0036Preventive maintenance backlogClose-out0%
  • PRJ-0025Replace parts of cable trays on main cablePreparation0%
  • PRJ-0065TK 1401: (Out-of-service) inspection & TTARExecution0%
  • PRJ-0069TK 1706: (Out-of-service) inspection & TTARClose-out60%
  • PRJ-0016TK 1712 - roof drain replacementClose-out100%
  • PRJ-0030SHEQ ImprovementClose-out0%
  • PRJ-0237TK 703 - bottom plate renewalPreparation0%
  • PRJ-0023Emergency shower replacementClose-out0%
  • PRJ-0015Gas detection installationExecution0%
  • PRJ-0172TTAR Tank 309Close-out100%
  • PRJ-0081Tk 1107: (Out-of-service) inspection & TTARExecution60%
  • PRJ-0017TK 1802 - bottom plate renewalClose-out70%
  • PRJ-0033TK 402 - floating roof seal replacementClose-out100%
  • PRJ-0082Tk 1108: (Out-of-service) inspection & TTARExecution70%
  • PRJ-0083Tk 1109: (Out-of-service) inspection & TTARExecution20%
  • PRJ-0162Painting tanksClose-out0%
  • PRJ-0240Painting tanksClose-out0%
  • PRJ-0088Tk 2914: (Out-of-service) inspection & TTARExecution0%
  • PRJ-00132019 Replacement LS distribution cabinetsExecution0%
  • PRJ-0019HeatwaveExecution0%
  • PRJ-0163Foundation repairsExecution0%
  • PRJ-0064TK 1110: (Out-of-service) inspection & TTARExecution70%
  • PRJ-0084Tk 1111: (Out-of-service) inspection & TTARExecution30%
  • PRJ-0085Tk 1115: (Out-of-service) inspection & TTARExecution40%
  • PRJ-0153Bund wall repairsExecution0%
  • PRJ-0055Replacement PMSX / PLC'sExecution70%
  • PRJ-0091Nitrogen blanketingExecution0%
  • PRJ-0037Loading arm renovationExecution88%
  • PRJ-0077Tk 1101: (Out-of-service) inspection & TTARExecution50%
  • PRJ-0078Tk 1103: (Out-of-service) inspection & TTARExecution60%
  • PRJ-0079Tk 1105: (Out-of-service) inspection & TTARExecution70%
  • PRJ-0080Tk 1106: (Out-of-service) inspection & TTARExecution50%
  • PRJ-0043Lighting replacementExecution0%
  • PRJ-0042CP Upgrade off-site PipelinesPreparation0%
  • PRJ-0173Level measurement replacementClose-out0%
  • PRJ-0250Terminal automation upgradeClose-out0%
  • PRJ-0075Tank cooling (and fire extinguishing) systemsExecution0%
  • PRJ-0271Tank cooling (and fire extinguishing) systemsClose-out100%
  • PRJ-0052Sewer renovationExecution0%
  • PRJ-0073TK 311: (Out-of-service) inspection & TTARClose-out50%
  • PRJ-0092Actuator replacementClose-out0%
  • PRJ-0095Updaten en aanvullen P&ID's en C&E'sExecution0%
  • PRJ-0185Replacement HV panel Inkoop stationExecution0%
  • PRJ-0187SHEQ improvement budgetClose-out0%
  • PRJ-0188Cable tray renewalExecution0%
  • PRJ-0196Painting and coating programmeClose-out0%
  • PRJ-0199Updaten en aanvullen P&ID's en C&E'sExecution0%
  • PRJ-0249Mixer overhaulExecution0%
  • PRJ-0251Out-of-service inspection and repairClose-out0%
  • PRJ-0262Replace camera systemClose-out0%
  • PRJ-0264Replacement Lighting workplacesClose-out0%
  • PRJ-0265SHEQ improvement budgetExecution0%
  • PRJ-0267Lighting replacementExecution0%
  • PRJ-0275Updaten en aanvullen P&ID's en C&E'sExecution0%
  • PRJ-0276Actuator replacementClose-out0%
  • PRJ-0239Maintenance charge to capexClose-out0%
  • PRJ-0193Tank cooling (and fire extinguishing) systemsClose-out100%
  • PRJ-0179On-site pipeline maintenanceClose-out0%
  • PRJ-0257On-site pipeline maintenanceClose-out0%
  • PRJ-0089VRB turnaround planExecution0%
  • PRJ-0160Maintenance charge to capexClose-out0%
  • PRJ-0191TK 902: (Out-of-service) inspection & TTARExecution0%
  • PRJ-0045Loading arm renovationClose-out0%
  • PRJ-0047On-site pipeline inspectionExecution0%
  • PRJ-0177Pump overhaulExecution0%
  • PRJ-0178On-site pipeline inspectionExecution0%
  • PRJ-0253Loading arm renovationClose-out0%
  • PRJ-0256On-site pipeline inspectionExecution0%
  • PRJ-0048On-site pipeline maintenanceExecution0%
  • PRJ-0056Replacement underground firewater pipelinesExecution0%

First 120 shown. Narrow with a name or a tile above.

On the gate line

298 projects, step by step
Phase / kindStepOwnerDateDoneNote
IdentificationPRJ-0031Building maintenanceOn holdI. Abdi25 Jul 2615%74 → 74 k€0.0%
IdentificationPRJ-0032Pig catcher replacementOn trackM. Bakker28 Jul 2635%268 → 268 k€0.0%
IdentificationPRJ-0049Bund wall repairsOn holdR. Janssen25 Jul 2615%579 → 579 k€0.0%
IdentificationPRJ-0050Preventive maintenance backlogOn trackA. Mulder10 Nov 2635%42 → 42 k€0.0%
IdentificationPRJ-0059TK 1902 - mixer overhaulOn holdW. van Leeuwen25 Jul 2615%391 → 391 k€0.0%
IdentificationPRJ-0093Loading arm renovationOn trackK. van Dijk6 Nov 2655%241 → 241 k€0.0%
IdentificationPRJ-0098Civil repairs roads-pavementsOn trackF. de Boer12 Aug 2635%900 → 900 k€0.0%
IdentificationPRJ-0100Install lifting equipment manifold bayOn trackR. Janssen11 Sep 2670%599 → 599 k€0.0%
IdentificationPRJ-0101Jetty repairOn trackT. Okonkwo28 Aug 2680%665 → 665 k€0.0%
IdentificationPRJ-0103Retaining wall repairsOn trackJ. Visser27 Jul 2695%613 → 613 k€0.0%
IdentificationPRJ-0104Replacement underground firewater pipelinesOn trackA. Mulder9 Oct 2635%641 → 641 k€0.0%
IdentificationPRJ-0106Concrete repairs to roads and hardstandingOn trackP. Hoekstra5 Jan 2770%418 → 418 k€0.0%
IdentificationPRJ-0109Earthing structures and pipelinesOn trackE. Vermeulen18 Aug 2695%248 → 248 k€0.0%
IdentificationPRJ-0113Replace flowtransmitters jetty -02On trackM. Bakker17 Nov 2635%317 → 317 k€0.0%
IdentificationPRJ-0114Maintenance activities offices and buildingsOn trackS. de Vries28 Jul 2655%88 → 88 k€0.0%
IdentificationPRJ-0115Pipework replacementOn trackR. Janssen10 Jul 2670%116 → 116 k€0.0%
IdentificationPRJ-0116On-site pipeline inspectionOn holdT. Okonkwo25 Jul 2615%351 → 351 k€0.0%
IdentificationPRJ-0117On-site pipeline maintenanceOn trackL. Haddad28 Jul 2690%301 → 301 k€0.0%
IdentificationPRJ-0118Pipe sleeves/penetrations replacementOn trackJ. Visser28 Jul 2695%304 → 304 k€0.0%
IdentificationPRJ-0119Renovation marine loading armsOn trackA. Mulder28 Jul 2635%306 → 306 k€0.0%
IdentificationPRJ-0120Pig catcher replacementOn trackD. Kramer28 Jul 2690%156 → 156 k€0.0%
IdentificationPRJ-0121Nitrogen blanketingOn holdE. Vermeulen25 Jul 2615%186 → 186 k€0.0%
IdentificationPRJ-0122Waste water process improvementOn trackF. de Boer28 Jul 2635%161 → 161 k€0.0%
IdentificationPRJ-0123TK 1906 - floating roof seal replacementOn trackH. Nawrocki28 Jul 2655%229 → 229 k€0.0%
IdentificationPRJ-0124In Service (On Stream) InspectionsOn trackC. Peeters28 Jul 2670%232 → 232 k€0.0%
IdentificationPRJ-0125TK 1907 - shell plate repairsOn trackW. van Leeuwen28 Jul 2680%236 → 236 k€0.0%
IdentificationPRJ-0126Replacement P8 water treatmentOn trackG. Smits28 Jul 2690%103 → 103 k€0.0%
IdentificationPRJ-0127Gas detection installationOn trackI. Abdi28 Jul 2695%196 → 196 k€0.0%
IdentificationPRJ-0128Portfolio contingencyOn holdM. Bakker25 Jul 2615%173 → 173 k€0.0%
IdentificationPRJ-0129TK 0214: (Out-of-service) inspection & TTAROn trackS. de Vries28 Aug 2655%159 → 159 k€0.0%
IdentificationPRJ-0130Tk 0215: (Out-of-service) inspection & TTAROn trackJ. Visser11 Sep 2695%209 → 209 k€0.0%
IdentificationPRJ-0131TK 0307: (Out-of-service) inspection & TTAROn trackA. Mulder21 Oct 2635%203 → 203 k€0.0%
IdentificationPRJ-0132TK 0314: (Out-of-service) inspection & TTAROn trackK. van Dijk9 Oct 2655%214 → 214 k€0.0%
IdentificationPRJ-0133Tk 0317: (Out-of-service) inspection & TTAROn trackP. Hoekstra9 Oct 2670%216 → 216 k€0.0%
IdentificationPRJ-0134TK 0502: (Out-of-service) inspection & TTAROn trackN. Yilmaz25 Sep 2680%241 → 241 k€0.0%
IdentificationPRJ-0135TK 0504: (Out-of-service) inspection & TTAROn trackD. Kramer7 Aug 2690%327 → 327 k€0.0%
IdentificationPRJ-0138TK 1316: (Out-of-service) inspection & TTAROn trackH. Nawrocki29 Mar 2755%234 → 234 k€0.0%
IdentificationPRJ-0139TTAR Tank 1408On holdC. Peeters25 Jul 2615%424 → 424 k€0.0%
IdentificationPRJ-0140TK 1604: (Out-of-service) inspection & TTAROn trackM. Bakker28 Jul 2635%287 → 287 k€0.0%
IdentificationPRJ-0141TK 1612: (Out-of-service) inspection & TTAROn trackS. de Vries5 Jan 2755%290 → 290 k€0.0%
IdentificationPRJ-0142TK 1805: (Out-of-service) inspection & TTAROn trackR. Janssen16 Apr 2770%296 → 296 k€0.0%
IdentificationPRJ-0144TK 1807: (Out-of-service) inspection & TTAROn trackL. Haddad6 Nov 2690%301 → 301 k€0.0%
IdentificationPRJ-0145TK 2005: On-Stream inspectionOn trackJ. Visser28 Jul 2695%457 → 457 k€0.0%
IdentificationPRJ-0146TK 2202: (Out-of-service) inspection & TTAROn trackA. Mulder13 Apr 2735%422 → 422 k€0.0%
IdentificationPRJ-0154Painting and coating programmeOn holdI. Abdi25 Jul 2615%55 → 55 k€0.0%
IdentificationPRJ-0157Study and front-end engineeringOn holdR. Janssen25 Jul 2615%200 → 200 k€0.0%
IdentificationPRJ-0164Building maintenanceOn holdF. de Boer25 Jul 2615%300 → 700 k€+133.5%
IdentificationPRJ-0168Painting and coating programmeOn trackG. Smits28 Jul 2690%68 → 68 k€0.0%
IdentificationPRJ-0174Lifting equipment inspectionOn trackK. van Dijk28 Jul 2655%84 → 84 k€0.0%
IdentificationPRJ-0200Fence renewalOn trackN. Yilmaz10 Nov 2680%550 → 550 k€0.0%
IdentificationPRJ-0201BundwallsOn trackD. Kramer13 Oct 2690%540 → 540 k€0.0%
IdentificationPRJ-0204Repl. Part wastwatersewer pipelinesOn trackH. Nawrocki12 Oct 2655%482 → 482 k€0.0%
IdentificationPRJ-0205Replacement underground firewater pipelinesOn trackC. Peeters9 Apr 2770%459 → 459 k€0.0%
IdentificationPRJ-0207Retaining wall repairsOn trackG. Smits11 Feb 2790%378 → 378 k€0.0%
IdentificationPRJ-0210Earthing and bonding surveyOn trackL. Haddad17 Nov 2690%214 → 214 k€0.0%
IdentificationPRJ-0214Replace tourniquetOn trackP. Hoekstra28 Jul 2670%80 → 80 k€0.0%
IdentificationPRJ-0215On-site pipeline inspectionOn holdN. Yilmaz25 Jul 2615%315 → 315 k€0.0%
IdentificationPRJ-0216On-site pipeline maintenanceOn holdD. Kramer25 Jul 2615%318 → 318 k€0.0%
IdentificationPRJ-0217SHEQ improvement budgetOn trackE. Vermeulen28 Jul 2695%273 → 273 k€0.0%
IdentificationPRJ-0218Actions out of HAZOPOn trackF. de Boer28 Jul 2635%276 → 276 k€0.0%
IdentificationPRJ-0219In Service (On Stream) InspectionsOn holdH. Nawrocki25 Jul 2615%458 → 458 k€0.0%
IdentificationPRJ-0220Install floating roof seals'TK 708/809/810On trackI. Abdi28 Jul 2695%468 → 468 k€0.0%
IdentificationPRJ-0221TK 0202: (Out-of-service) inspection & TTAROn trackM. Bakker31 Jul 2635%249 → 249 k€0.0%
IdentificationPRJ-0223TK 0209: (Out-of-service) inspection & TTAROn trackR. Janssen19 Feb 2770%253 → 253 k€0.0%
IdentificationPRJ-0224TK 0312: (Out-of-service) inspection & TTAROn trackT. Okonkwo23 Oct 2680%286 → 286 k€0.0%
IdentificationPRJ-0225TK 0505: (Out-of-service) inspection & TTAROn trackL. Haddad25 Sep 2690%265 → 265 k€0.0%
IdentificationPRJ-0227TK 0909: (Out-of-service) inspection & TTAROn trackA. Mulder28 Apr 2735%384 → 384 k€0.0%
IdentificationPRJ-0228TK 0910: (Out-of-service) inspection & TTAROn trackK. van Dijk9 Oct 2655%385 → 385 k€0.0%
IdentificationPRJ-0234Building maintenanceOn holdG. Smits25 Jul 2615%60 → 60 k€0.0%
IdentificationPRJ-0241Replacement MCC's pump roomsOn trackP. Hoekstra19 Mar 2770%1261.4 → 3212 k€+154.7%
IdentificationPRJ-0242TK 310 - internal coating renewalOn trackN. Yilmaz28 Jul 2680%407 → 407 k€0.0%
IdentificationPRJ-0254Mixer Tank 207On trackA. Mulder6 Nov 2635%29 → 29 k€0.0%
IdentificationPRJ-0259Painting and coating programmeOn holdE. Vermeulen25 Jul 2615%50 → 50 k€0.0%
IdentificationPRJ-0261Emergency shower replacementOn holdG. Smits25 Jul 2615%67 → 67 k€0.0%
IdentificationPRJ-0266TK 406 - roof drain replacementOn trackT. Okonkwo6 Nov 2680%257 → 257 k€0.0%
IdentificationPRJ-0272Lifting equipment inspectionOn holdF. de Boer25 Jul 2615%89 → 89 k€0.0%
IdentificationPRJ-0278Hydrant replacementOn trackM. Bakker28 Jul 2635%80 → 80 k€0.0%
IdentificationPRJ-0279Civil repairs roads-pavementsOn trackS. de Vries13 Oct 2655%983 → 983 k€0.0%
IdentificationPRJ-0280Concrete plates railOn trackJ. Visser28 Jul 2695%45 → 45 k€0.0%
IdentificationPRJ-0282Stairways and handrailing adjust/addOn trackK. van Dijk28 Jul 2655%46 → 46 k€0.0%
IdentificationPRJ-0284Fire water pump repairOn trackN. Yilmaz28 Jul 2680%47 → 47 k€0.0%
IdentificationPRJ-0286Camera system replacementOn trackE. Vermeulen28 Jul 2695%231 → 231 k€0.0%
IdentificationPRJ-0289Fence repairOn trackC. Peeters28 Jul 2670%64 → 64 k€0.0%
IdentificationPRJ-0290Maintenance Activities Offices and BuildingsOn trackM. Bakker28 Jul 2635%80 → 80 k€0.0%
IdentificationPRJ-0291On-site pipeline inspectionOn holdS. de Vries25 Jul 2615%318 → 318 k€0.0%
IdentificationPRJ-0292On-site pipeline maintenanceOn holdR. Janssen25 Jul 2615%321 → 321 k€0.0%
IdentificationPRJ-0293Study N2 bufferingOn trackT. Okonkwo28 Jul 2680%276 → 276 k€0.0%
IdentificationPRJ-0294In service (On Stream) InspectionsOn holdL. Haddad25 Jul 2615%458 → 458 k€0.0%
IdentificationPRJ-0295TK S3: (Out-of-service) inspection & TTAROn trackJ. Visser27 Jan 2795%196 → 196 k€0.0%
IdentificationPRJ-0297TK 0115: (Out-of-service) inspection & TTAROn trackK. van Dijk21 Aug 2655%225 → 225 k€0.0%
SelectionPRJ-0014Fire proofing of structuresOn trackF. de Boer14 Aug 2635%1420 → 1420 k€0.0%
SelectionPRJ-0018Oxygen monitoring installationOn trackG. Smits6 Nov 2690%528 → 528 k€0.0%
SelectionPRJ-0108Cable tray renewalOn trackD. Kramer11 Aug 2690%271 → 271 k€0.0%
SelectionPRJ-0181Loading arm renovationOn trackI. Abdi20 Aug 2695%156 → 156 k€0.0%
SelectionPRJ-0198Oxygen monitoring installationOn trackS. de Vries6 Aug 2655%470 → 470 k€0.0%
DefinitionPRJ-0025Replace parts of cable trays on main cableOn trackP. Hoekstra31 Jul 2670%328 → 328 k€0.0%
DefinitionPRJ-0035Pipework replacementOn trackT. Okonkwo10 Nov 2680%266 → 266 k€0.0%
DefinitionPRJ-0039Retaining wall repairsOn trackK. van Dijk11 Sep 2655%1025 → 1025 k€0.0%
DefinitionPRJ-0042CP Upgrade off-site PipelinesOn trackH. Nawrocki6 Nov 2655%843 → 843 k€0.0%
DefinitionPRJ-0097Bund wall repairsOn trackE. Vermeulen7 Aug 2695%1069 → 1069 k€0.0%
DefinitionPRJ-0099Contractor housingOn trackH. Nawrocki6 Nov 2655%1028 → 1028 k€0.0%
DefinitionPRJ-0102Mod Fire Proofing pipe and cable sleeves/penetrationsOn trackL. Haddad11 Sep 2690%690 → 690 k€0.0%
DefinitionPRJ-0105Sewer renovation North & SouthOn trackK. van Dijk11 Sep 2655%668 → 668 k€0.0%
DefinitionPRJ-0110Install PT's external pipelinesOn trackW. van Leeuwen27 Nov 2680%327 → 327 k€0.0%
DefinitionPRJ-0143Tk 1806: (Out-of-service) inspection & TTARAt riskT. Okonkwo24 Jul 2680%364 → 364 k€0.0%
DefinitionPRJ-0165Loading arm renovationOn trackH. Nawrocki11 Aug 2655%414 → 414 k€0.0%
DefinitionPRJ-0202Mod Fire Proofing pipe and cable sleeves / penetrationsOn trackE. Vermeulen11 Sep 2695%597 → 597 k€0.0%
DefinitionPRJ-0203Foundation repairsOn trackF. de Boer7 Aug 2635%560 → 560 k€0.0%
DefinitionPRJ-0209Install PT's external pipelinesOn trackM. Bakker27 Nov 2635%230 → 230 k€0.0%
DefinitionPRJ-0211Replace PT's incl. B&B valveOn trackJ. Visser8 Jan 2795%293 → 293 k€0.0%
DefinitionPRJ-0213Off-site line In-line inspection & section replacementOn trackK. van Dijk9 Oct 2655%711 → 711 k€0.0%
DefinitionPRJ-0237TK 703 - bottom plate renewalAt riskS. de Vries12 Jun 2655%485 → 485 k€0.0%
DefinitionPRJ-0277Stair and handrail renewalOn trackI. Abdi7 Aug 2695%1018 → 1018 k€0.0%
DefinitionPRJ-0281Mod Fire Proofing lines and cable sleeves/penetrationsOn trackA. Mulder11 Sep 2635%631 → 631 k€0.0%
DefinitionPRJ-0287Install PT's external pipelinesOn trackF. de Boer27 Nov 2635%239 → 239 k€0.0%
ExecutionPRJ-0003Water treatment phase 1 HAZOP actionsAt riskG. Smits16 Oct 2655%497 → 528 k€+6.2%
ExecutionPRJ-0004Off-site pipeline inspection off-site lineOn trackI. Abdi5 Feb 2728%959 → 959 k€0.0%
ExecutionPRJ-0005Motor control centre replacementOn trackM. Bakker11 Sep 2644%875.9 → 876 k€0.0%
ExecutionPRJ-0006E Drawings & Contractor housingOn trackS. de Vries11 Nov 2649%106 → 106 k€0.0%
ExecutionPRJ-0007Gas detection installationOn trackR. Janssen11 Nov 2749%174 → 174 k€0.0%
ExecutionPRJ-0009Reparaties manifoldsOn trackL. Haddad11 May 2778%895 → 1246 k€+39.3%
ExecutionPRJ-0010Reparaties schuim en sprenklerleidingenOn trackP. Hoekstra6 Nov 2649%520 → 520 k€0.0%
ExecutionPRJ-0012Sewer renovationOn trackD. Kramer18 Dec 2676%427.4 → 427 k€0.0%
ExecutionPRJ-00132019 Replacement LS distribution cabinetsOn trackE. Vermeulen10 Aug 2680%471 → 471 k€0.0%
ExecutionPRJ-0015Gas detection installationOn trackH. Nawrocki11 Sep 2629%492 → 492 k€0.0%
ExecutionPRJ-0019HeatwaveOn trackI. Abdi8 Feb 2766%383 → 383 k€0.0%
ExecutionPRJ-0026Replacement MOV actuators 2018On trackN. Yilmaz29 Jan 2733%411 → 411 k€0.0%
ExecutionPRJ-0027Lighting replacementOn trackD. Kramer2 Oct 2640%223 → 223 k€0.0%
ExecutionPRJ-0028Cable tray renewalOn trackE. Vermeulen9 Jul 2747%1082 → 1369 k€+26.5%
ExecutionPRJ-0037Loading arm renovationOn trackJ. Visser27 Jul 2626%374 → 374 k€0.0%
ExecutionPRJ-0040High-voltage panel replacementOn trackE. Vermeulen7 Aug 2628%153.6 → 177 k€+15.2%
ExecutionPRJ-0041Pump overhaulOn trackF. de Boer10 Dec 2643%400 → 400 k€0.0%
ExecutionPRJ-0043Lighting replacementOn trackC. Peeters7 Aug 2649%460 → 460 k€0.0%
ExecutionPRJ-0044Sewer renovationOn trackW. van Leeuwen13 Nov 2665%107.9 → 112 k€+3.9%
ExecutionPRJ-0046Fire water pump repairOn trackI. Abdi16 Mar 2778%85 → 85 k€0.0%
ExecutionPRJ-0047On-site pipeline inspectionAt riskM. Bakker24 Jul 2627%176 → 176 k€0.0%
ExecutionPRJ-0048On-site pipeline maintenanceOn trackS. de Vries28 Jul 2629%227 → 227 k€0.0%
ExecutionPRJ-0052Sewer renovationOn trackP. Hoekstra12 Oct 2745%3026.3 → 3558 k€+17.6%
ExecutionPRJ-0053Loading arm renovationOn trackN. Yilmaz8 Oct 2645%221 → 221 k€0.0%
ExecutionPRJ-0054Hydrant replacementOn trackD. Kramer9 Nov 2652%148.2 → 184 k€+24.0%
ExecutionPRJ-0055Replacement PMSX / PLC'sOn trackE. Vermeulen13 Aug 2667%161 → 161 k€0.0%
ExecutionPRJ-0056Replacement underground firewater pipelinesOn trackF. de Boer8 Jan 2774%1285.8 → 1639 k€+27.5%
ExecutionPRJ-0057Preventive maintenance backlogAt riskH. Nawrocki1 May 2684%60 → 95 k€+57.5%
ExecutionPRJ-0060TK 1903 - vent valve replacementAt riskS. de Vries24 Jul 2681%449 → 449 k€0.0%
ExecutionPRJ-0061TK 1905 - out-of-service inspection and repairOn trackR. Janssen18 Sep 2627%364 → 364 k€0.0%
ExecutionPRJ-0064TK 1110: (Out-of-service) inspection & TTAROn trackJ. Visser14 Aug 2647%534 → 534 k€0.0%
ExecutionPRJ-0065TK 1401: (Out-of-service) inspection & TTAROn trackA. Mulder29 Sep 2654%617 → 617 k€0.0%
ExecutionPRJ-0067TK 1608: (Out-of-service) inspection & TTAROn trackP. Hoekstra7 Aug 2675%435 → 435 k€0.0%
ExecutionPRJ-0068TK 1610: (Out-of-service) inspection & TTAROn trackN. Yilmaz7 Aug 2683%442 → 442 k€0.0%
ExecutionPRJ-0070TK 1710: (Out-of-service) inspection & TTARAt riskC. Peeters10 Jun 2677%250 → 250 k€0.0%
ExecutionPRJ-0071TK 2934: (Out-of-service) inspection & TTAROn trackW. van Leeuwen10 Sep 2685%196 → 196 k€0.0%
ExecutionPRJ-0075Tank cooling (and fire extinguishing) systemsOn trackS. de Vries8 Sep 2649%1372.9 → 1373 k€0.0%
ExecutionPRJ-0076Actuator replacementOn trackR. Janssen7 Aug 2649%205 → 205 k€0.0%
ExecutionPRJ-0077Tk 1101: (Out-of-service) inspection & TTAROn trackT. Okonkwo14 Aug 2665%308 → 308 k€0.0%
ExecutionPRJ-0078Tk 1103: (Out-of-service) inspection & TTAROn trackL. Haddad14 Aug 2678%320 → 320 k€0.0%
ExecutionPRJ-0079Tk 1105: (Out-of-service) inspection & TTAROn trackJ. Visser14 Aug 2680%315 → 315 k€0.0%
ExecutionPRJ-0080Tk 1106: (Out-of-service) inspection & TTAROn trackN. Yilmaz14 Aug 2664%408 → 408 k€0.0%
ExecutionPRJ-0081Tk 1107: (Out-of-service) inspection & TTAROn trackD. Kramer14 Aug 2676%456 → 456 k€0.0%
ExecutionPRJ-0082Tk 1108: (Out-of-service) inspection & TTAROn trackE. Vermeulen14 Aug 2678%450 → 450 k€0.0%
ExecutionPRJ-0083Tk 1109: (Out-of-service) inspection & TTAROn trackF. de Boer14 Aug 2625%454 → 454 k€0.0%
ExecutionPRJ-0084Tk 1111: (Out-of-service) inspection & TTAROn trackH. Nawrocki17 Aug 2629%449 → 449 k€0.0%
ExecutionPRJ-0085Tk 1115: (Out-of-service) inspection & TTAROn trackC. Peeters17 Aug 2645%453 → 453 k€0.0%
ExecutionPRJ-0086Tk 1407: (Out-of-service) inspection & TTAROn trackW. van Leeuwen29 Jul 2644%385 → 385 k€0.0%
ExecutionPRJ-0087Tk 1709: (Out-of-service) inspection & TTARAt riskG. Smits26 Jun 2652%393 → 393 k€0.0%
ExecutionPRJ-0088Tk 2914: (Out-of-service) inspection & TTAROn trackI. Abdi26 Jan 2766%508 → 508 k€0.0%
ExecutionPRJ-0089VRB turnaround planOn trackM. Bakker11 May 2772%362 → 362 k€0.0%
ExecutionPRJ-0090Portfolio contingencyOn trackL. Haddad7 Aug 2652%200 → 200 k€0.0%
ExecutionPRJ-0091Nitrogen blanketingOn trackJ. Visser6 Jan 2767%456 → 456 k€0.0%
ExecutionPRJ-0095Updaten en aanvullen P&ID's en C&E'sOn trackN. Yilmaz14 May 2733%459 → 459 k€0.0%
ExecutionPRJ-0096Hydrant replacementOn trackD. Kramer1 May 2641%76 → 76 k€0.0%
ExecutionPRJ-0107Tank cooling (and fire extinguishing) systemsAt riskN. Yilmaz15 Jun 2665%743 → 743 k€0.0%
ExecutionPRJ-0111Gas detection installationOn trackG. Smits12 Nov 2778%392 → 392 k€0.0%
ExecutionPRJ-0112Replacement LV distribution cabinetsOn trackI. Abdi13 Aug 2780%363 → 363 k€0.0%
ExecutionPRJ-0136TK 0803: (Out-of-service) inspection & TTAROn trackE. Vermeulen13 Nov 2628%351 → 351 k€0.0%
ExecutionPRJ-0137TK 0903: (Out-of-service) inspection & TTAR (-19 CO)On trackF. de Boer29 Sep 2644%259 → 259 k€0.0%
ExecutionPRJ-0147Ensure reliable waste water processOn trackK. van Dijk9 Oct 2629%421 → 421 k€0.0%
ExecutionPRJ-0148Replace flowmeter/computer LP7On trackP. Hoekstra12 Oct 2645%808 → 808 k€0.0%
ExecutionPRJ-0149Replacement SCADA / PLCOn trackN. Yilmaz14 Dec 2644%4820 → 4820 k€0.0%
ExecutionPRJ-0150Camera system replacementOn trackH. Nawrocki17 Sep 2731%850 → 850 k€0.0%
ExecutionPRJ-0151Fire water pump repairOn trackC. Peeters8 Apr 2745%86 → 86 k€0.0%
ExecutionPRJ-0153Bund wall repairsOn trackG. Smits8 Oct 2752%2480.4 → 2586 k€+4.3%
ExecutionPRJ-0156Cable tray renewalOn trackS. de Vries8 Dec 2684%369 → 369 k€0.0%
ExecutionPRJ-0160Maintenance charge to capexOn trackP. Hoekstra10 Nov 2525%43 → 43 k€0.0%
ExecutionPRJ-0163Foundation repairsOn trackE. Vermeulen11 Sep 2647%1073 → 1073 k€0.0%
ExecutionPRJ-0166Camera system replacementOn trackC. Peeters7 Aug 2675%808.6 → 809 k€0.0%
ExecutionPRJ-0170Waste water process improvementOn trackT. Okonkwo7 Aug 2685%498 → 498 k€0.0%
ExecutionPRJ-0171Pipework replacementOn trackL. Haddad10 Mar 2727%572 → 572 k€0.0%
ExecutionPRJ-0176Install IDDTK 708-809-810On trackN. Yilmaz17 Sep 2765%268 → 268 k€0.0%
ExecutionPRJ-0177Pump overhaulOn trackD. Kramer4 Jan 2778%194 → 194 k€0.0%
ExecutionPRJ-0178On-site pipeline inspectionOn trackE. Vermeulen9 Oct 2678%182 → 182 k€0.0%
ExecutionPRJ-0180Hydrant replacementOn trackG. Smits8 Jul 2676%50 → 50 k€0.0%
ExecutionPRJ-0182Off-site line section replacementOn trackM. Bakker13 Aug 2625%364 → 364 k€0.0%
ExecutionPRJ-0183Study and front-end engineeringOn trackS. de Vries10 Nov 2629%216 → 216 k€0.0%
ExecutionPRJ-0184Emergency shower replacementOn trackR. Janssen7 Aug 2645%80 → 80 k€0.0%
ExecutionPRJ-0185Replacement HV panel Inkoop stationOn trackT. Okonkwo7 Aug 2645%252.9 → 253 k€0.0%
ExecutionPRJ-0188Cable tray renewalOn trackA. Mulder5 Feb 2774%346 → 408 k€+17.9%
ExecutionPRJ-0190TK 305: (Out-of-service) inspection & TTAROn trackE. Vermeulen28 Jul 2667%425 → 425 k€0.0%
ExecutionPRJ-0191TK 902: (Out-of-service) inspection & TTAROn trackF. de Boer23 Oct 2674%502 → 502 k€0.0%
ExecutionPRJ-0192TK 904: (Out-of-service) inspection & TTAROn trackH. Nawrocki22 Oct 2681%543 → 543 k€0.0%
ExecutionPRJ-0194Tk 501: (Out-of-service) inspection & TTAROn trackW. van Leeuwen31 Aug 2633%491 → 491 k€0.0%
ExecutionPRJ-0195Lifting equipment inspectionOn trackG. Smits27 Oct 2640%79 → 79 k€0.0%
ExecutionPRJ-0199Updaten en aanvullen P&ID's en C&E'sOn trackR. Janssen13 May 2775%434 → 434 k€0.0%
ExecutionPRJ-0206Tank cooling (and fire extinguishing) systemsOn trackW. van Leeuwen14 Apr 2764%653 → 653 k€0.0%
ExecutionPRJ-0208Access control high/low voltage stationsOn trackI. Abdi11 Dec 2678%189 → 189 k€0.0%
ExecutionPRJ-0212Cable tray renewalOn trackA. Mulder12 Nov 2725%357 → 357 k€0.0%
ExecutionPRJ-0222TK 0208: (Out-of-service) inspection & TTAROn trackS. de Vries14 Aug 2681%379 → 379 k€0.0%
ExecutionPRJ-0226TK 0608: (Out-of-service) inspection & TTAROn trackJ. Visser7 Aug 2647%385 → 385 k€0.0%
ExecutionPRJ-0229Level measurement replacementOn trackP. Hoekstra5 Feb 2775%580 → 580 k€0.0%
ExecutionPRJ-0230Camera system replacementOn trackF. de Boer5 Feb 2754%1412 → 1412 k€0.0%
ExecutionPRJ-0233Low-voltage distribution cabinet replacementOn trackW. van Leeuwen9 Oct 2685%662 → 662 k€0.0%
ExecutionPRJ-0236Cable tray renewalOn trackM. Bakker7 Aug 2644%260 → 260 k€0.0%
ExecutionPRJ-0243Vapour recovery modificationOn trackD. Kramer7 Aug 2676%424 → 424 k€0.0%
ExecutionPRJ-0244Pit 6 N2 incl. permanente zuurstofbewakinOn trackE. Vermeulen9 Sep 2680%420 → 420 k€0.0%
ExecutionPRJ-0247Closed pigcatcher systemOn trackC. Peeters10 Nov 2645%170 → 170 k€0.0%
ExecutionPRJ-0248Building maintenanceOn trackW. van Leeuwen7 Aug 2645%197.4 → 197 k€0.0%
ExecutionPRJ-0249Mixer overhaulOn trackG. Smits11 Sep 2652%479 → 479 k€0.0%
ExecutionPRJ-0255Insulation renewalOn trackK. van Dijk11 Sep 2681%172 → 172 k€0.0%
ExecutionPRJ-0256On-site pipeline inspectionOn trackP. Hoekstra9 Oct 2627%200 → 200 k€0.0%
ExecutionPRJ-0260Cable tray renewalOn trackW. van Leeuwen10 Aug 2631%31.1 → 31 k€0.0%
ExecutionPRJ-0265SHEQ improvement budgetOn trackR. Janssen10 Sep 2677%68 → 68 k€0.0%
ExecutionPRJ-0267Lighting replacementOn trackL. Haddad5 Feb 2725%339 → 339 k€0.0%
ExecutionPRJ-0268TK 204: (Out-of-service) inspection & TTAROn trackJ. Visser7 Aug 2626%407 → 407 k€0.0%
ExecutionPRJ-0270TK 805: (Out-of-service) inspection & TTAROn trackD. Kramer3 Sep 2627%446 → 446 k€0.0%
ExecutionPRJ-0275Updaten en aanvullen P&ID's en C&E'sOn trackW. van Leeuwen11 May 2765%447 → 447 k€0.0%
ExecutionPRJ-0283Tank cooling (and fire extinguishing) systemsOn trackP. Hoekstra14 May 2745%670 → 670 k€0.0%
ExecutionPRJ-0285Access control high/low voltage stationsOn trackD. Kramer11 Dec 2652%184 → 184 k€0.0%
ExecutionPRJ-0288High-voltage panel replacementOn trackH. Nawrocki12 Nov 2784%287 → 287 k€0.0%
ExecutionPRJ-0296TK 0113: (Out-of-service) inspection & TTAROn trackA. Mulder2 Oct 2654%334 → 334 k€0.0%
ExecutionPRJ-0298TK 0407: (Out-of-service) inspection & TTAROn trackP. Hoekstra2 Oct 2675%421 → 421 k€0.0%
Close-outPRJ-0001Pump overhaulOn trackC. Peeters11 Sep 2668%564 → 564 k€0.0%
Close-outPRJ-0002Tank 2101: Inspection + Repair +MaintenanceOn trackW. van Leeuwen12 Jun 2669%601 → 601 k€0.0%
Close-outPRJ-0008Maintenance activities offices and buildingOn trackT. Okonkwo15 May 2649%96 → 96 k€0.0%
Close-outPRJ-0011Fire water pump repairOn trackN. Yilmaz25 Nov 2549%84 → 84 k€0.0%
Close-outPRJ-0016TK 1712 - roof drain replacementOn trackC. Peeters15 Jun 2668%572 → 572 k€0.0%
Close-outPRJ-0017TK 1802 - bottom plate renewalOn trackW. van Leeuwen4 Aug 2667%556 → 556 k€0.0%
Close-outPRJ-0020Cable tray renewalOn trackT. Okonkwo15 Oct 2669%145 → 145 k€0.0%
Close-outPRJ-0021Jetty repairOn trackL. Haddad11 Sep 2643%1459.3 → 1459 k€0.0%
Close-outPRJ-0022Mechanical modifications during TTAROn trackJ. Visser8 May 2641%268 → 268 k€0.0%
Close-outPRJ-0023Emergency shower replacementOn trackA. Mulder8 May 2665%55 → 55 k€0.0%
Close-outPRJ-0024Renovation marine loading armsBlockedK. van Dijk13 Apr 2664%274 → 274 k€0.0%
Close-outPRJ-0029Preventive maintenance backlogOn trackF. de Boer6 Feb 2636%62 → 62 k€0.0%
Close-outPRJ-0030SHEQ ImprovementOn trackG. Smits28 May 2661%77 → 77 k€0.0%
Close-outPRJ-0033TK 402 - floating roof seal replacementOn trackS. de Vries19 Jun 2646%438 → 438 k€0.0%
Close-outPRJ-0034Tank cooling (and fire extinguishing) systeOn trackR. Janssen3 Jul 2668%1337.6 → 1338 k€0.0%
Close-outPRJ-0036Preventive maintenance backlogAt riskL. Haddad10 Jul 2643%105 → 105 k€0.0%
Close-outPRJ-0038Crane overhaulAt riskA. Mulder5 Jun 2663%399 → 399 k€0.0%
Close-outPRJ-0045Loading arm renovationAt riskG. Smits16 Jun 2659%363 → 363 k€0.0%
Close-outPRJ-0051Lighting replacementOn trackK. van Dijk17 Jul 2646%42.1 → 42 k€0.0%
Close-outPRJ-0058SHEQ improvement budgetOn trackC. Peeters12 Jun 2640%55 → 55 k€0.0%
Close-outPRJ-0062Crane overhaulOn trackT. Okonkwo24 Aug 2649%239 → 239 k€0.0%
Close-outPRJ-0063TK 1104: (Out-of-service) inspection & TTAROn trackL. Haddad23 Oct 2661%462 → 462 k€0.0%
Close-outPRJ-0066TK 1404: (Out-of-service) inspection & TTAROn trackK. van Dijk16 Sep 2646%402 → 402 k€0.0%
Close-outPRJ-0069TK 1706: (Out-of-service) inspection & TTAROn trackD. Kramer4 Sep 2643%601 → 601 k€0.0%
Close-outPRJ-0072TK 301: (Out-of-service) inspection & TTAROn trackG. Smits7 Jul 2643%207 → 207 k€0.0%
Close-outPRJ-0073TK 311: (Out-of-service) inspection & TTAROn trackI. Abdi14 Sep 2642%270 → 270 k€0.0%
Close-outPRJ-0074TK 505: (Out-of-service) inspection & TTAROn trackM. Bakker3 Jul 2663%213 → 213 k€0.0%
Close-outPRJ-0092Actuator replacementOn trackA. Mulder30 Jul 2665%351 → 351 k€0.0%
Close-outPRJ-0094Uitwendig conserveren tankdak 501On trackP. Hoekstra25 Jun 2641%422 → 422 k€0.0%
Close-outPRJ-0152Hydrant replacementOn trackW. van Leeuwen6 Nov 2667%69 → 69 k€0.0%
Close-outPRJ-0155Foundation repairsOn trackM. Bakker12 Jun 2665%819 → 819 k€0.0%
Close-outPRJ-0158Fire proofing of structuresOn trackT. Okonkwo7 Aug 2649%933.5 → 934 k€0.0%
Close-outPRJ-0159Cathodic protection upgradeOn trackL. Haddad13 Aug 2659%547 → 547 k€0.0%
Close-outPRJ-0161On-site pipeline maintenanceOn trackN. Yilmaz10 Jul 2649%381 → 381 k€0.0%
Close-outPRJ-0162Painting tanksOn trackD. Kramer3 Sep 2661%79 → 79 k€0.0%
Close-outPRJ-0167Lifting equipment inspectionOn trackW. van Leeuwen7 Jul 2669%93 → 93 k€0.0%
Close-outPRJ-0169Preventive maintenance backlogOn trackI. Abdi22 Jun 2641%35 → 35 k€0.0%
Close-outPRJ-0172TTAR Tank 309On trackJ. Visser12 Jun 2642%581 → 581 k€0.0%
Close-outPRJ-0173Level measurement replacementOn trackA. Mulder19 May 2663%206 → 206 k€0.0%
Close-outPRJ-0175In Service (On Stream) InspectionOn trackP. Hoekstra8 May 2640%416 → 416 k€0.0%
Close-outPRJ-0179On-site pipeline maintenanceOn trackF. de Boer11 Sep 2637%177 → 177 k€0.0%
Close-outPRJ-0186Fire water pump repairOn trackL. Haddad26 Jun 2643%30 → 30 k€0.0%
Close-outPRJ-0187SHEQ improvement budgetOn trackJ. Visser26 Jun 2642%62.5 → 63 k€0.0%
Close-outPRJ-0189Motor control centre replacementOn trackK. van Dijk21 Aug 2677%232 → 232 k€0.0%
Close-outPRJ-0193Tank cooling (and fire extinguishing) systemsOn trackC. Peeters17 Jul 2641%253.8 → 254 k€0.0%
Close-outPRJ-0196Painting and coating programmeOn trackI. Abdi26 Jun 2674%75 → 75 k€0.0%
Close-outPRJ-0197Level measurement replacementOn trackM. Bakker2 Jul 2636%162 → 162 k€0.0%
Close-outPRJ-0231Operating computer replacementAt riskH. Nawrocki17 Jul 2646%191 → 191 k€0.0%
Close-outPRJ-0232Replacement MCC's pump roomsOn trackC. Peeters12 Aug 2668%390 → 390 k€0.0%
Close-outPRJ-0235Lighting replacementOn trackI. Abdi10 Jul 2642%344 → 344 k€0.0%
Close-outPRJ-0238Off-site line inspectionOn trackR. Janssen13 Aug 2640%594 → 594 k€0.0%
Close-outPRJ-0239Maintenance charge to capexOn trackT. Okonkwo13 Nov 2549%153 → 153 k€0.0%
Close-outPRJ-0240Painting tanksOn trackK. van Dijk7 Jul 2677%80 → 80 k€0.0%
Close-outPRJ-0245Tank cooling (and fire extinguishing) systeOn trackF. de Boer13 Jul 2636%425 → 425 k€0.0%
Close-outPRJ-0246Thermische expansie tankleidingenOn trackH. Nawrocki4 Sep 2646%443 → 443 k€0.0%
Close-outPRJ-0250Terminal automation upgradeOn trackR. Janssen19 May 2666%93 → 93 k€0.0%
Close-outPRJ-0251Out-of-service inspection and repairOn trackT. Okonkwo3 Jul 2669%231 → 231 k€0.0%
Close-outPRJ-0252In service (On Stream) InspectionsOn trackL. Haddad10 Jul 2643%213 → 213 k€0.0%
Close-outPRJ-0253Loading arm renovationOn trackJ. Visser16 Jun 2641%161 → 161 k€0.0%
Close-outPRJ-0257On-site pipeline maintenanceOn trackN. Yilmaz11 Sep 2649%194 → 194 k€0.0%
Close-outPRJ-0258Concrete repairs to roads and hardstandingOn trackD. Kramer31 Jul 2661%540 → 540 k€0.0%
Close-outPRJ-0262Replace camera systemOn trackI. Abdi21 Aug 2671%682.3 → 682 k€0.0%
Close-outPRJ-0263Gas detection installationOn trackM. Bakker10 Sep 2637%79.6 → 80 k€0.0%
Close-outPRJ-0264Replacement Lighting workplacesOn trackS. de Vries11 Nov 2646%176.6 → 177 k€0.0%
Close-outPRJ-0269TK 511: (Out-of-service) inspection & TTAROn trackA. Mulder8 Oct 2663%376 → 376 k€0.0%
Close-outPRJ-0271Tank cooling (and fire extinguishing) systemsOn trackE. Vermeulen18 Jun 2642%322.9 → 323 k€0.0%
Close-outPRJ-0273Painting and coating programmeAt riskH. Nawrocki10 Jul 2677%200 → 200 k€0.0%
Close-outPRJ-0274Terminal automation upgradeOn trackC. Peeters23 Jul 2640%176 → 176 k€0.0%
Close-outPRJ-0276Actuator replacementOn trackG. Smits10 Jul 2659%343 → 343 k€0.0%