Read asCoordinator298 of 298 projects

Projects

298

298 in the portfolio

Approved

118.912

k€

Forecast

123.084

k€, +4172 against approved

Status

as set by the manager
On track263
At risk14
Blocked1
On hold20

What somebody decided. The dates can disagree — 10 are past a gate.

Progress

% complete
0%223
1–25%10
26–50%23
51–75%21
76–100%21

0% is where a project sits until somebody plans it in detail.

Phase

where they stand
Initiation133
Definition5
Preparation20
Execution108
Close-out32

The further along the gate line, the stronger the bar.

Per coordinator

18 people · click a name to filter
NameProjectsPast gateWaitingApprovedForecastΔ
182277468056+310
1712565646701+137
172258605860
171889229676+754
1711849964996
1712273717723+351
172056615661
172454115446+36
1711856995761+62
1622984512.328+2483
162454175417
162299919991
162654435448+4
1611865276527
1611853215321
161857145714
1631872037238+35
1611452225222

Past its gate

10 projects
  • PRJ-0024Renovation marine loading armsClose-out103d
  • PRJ-0057Preventive maintenance backlogExecution85d
  • PRJ-0038Crane overhaulClose-out50d
  • PRJ-0237TK 703 - bottom plate renewalPreparation43d
  • PRJ-0045Loading arm renovationClose-out39d
  • PRJ-0036Preventive maintenance backlogClose-out15d
  • PRJ-0273Painting and coating programmeClose-out15d
  • PRJ-0231Operating computer replacementClose-out8d
  • PRJ-0047On-site pipeline inspectionExecution1d
  • PRJ-0143Tk 1806: (Out-of-service) inspection & TTARPreparation1d

Projects

298 in this cut
  • PRJ-0229Level measurement replacementExecution84%
  • PRJ-0001Pump overhaulClose-out0%
  • PRJ-0149Replacement SCADA / PLCExecution0%
  • PRJ-0148Replace flowmeter/computer LP7Execution0%
  • PRJ-0003Water treatment phase 1 HAZOP actionsExecution66%
  • PRJ-0004Off-site pipeline inspection off-site lineExecution0%
  • PRJ-0230Camera system replacementInitiation100%
  • PRJ-0005Motor control centre replacementExecution0%
  • PRJ-0002Tank 2101: Inspection + Repair +MaintenanceInitiation100%
  • PRJ-0006E Drawings & Contractor housingExecution0%
  • PRJ-0008Maintenance activities offices and buildingInitiation0%
  • PRJ-0026Replacement MOV actuators 2018Execution9%
  • PRJ-0007Gas detection installationExecution0%
  • PRJ-0232Replacement MCC's pump roomsClose-out0%
  • PRJ-0010Reparaties schuim en sprenklerleidingenExecution0%
  • PRJ-0233Low-voltage distribution cabinet replacementExecution50%
  • PRJ-0009Reparaties manifoldsExecution0%
  • PRJ-0231Operating computer replacementClose-out0%
  • PRJ-0022Mechanical modifications during TTARInitiation0%
  • PRJ-0012Sewer renovationExecution0%
  • PRJ-0029Preventive maintenance backlogInitiation0%
  • PRJ-0152Hydrant replacementClose-out100%
  • PRJ-0156Cable tray renewalExecution0%
  • PRJ-0161On-site pipeline maintenanceInitiation0%
  • PRJ-0171Pipework replacementExecution13%
  • PRJ-0245Tank cooling (and fire extinguishing) systeInitiation0%
  • PRJ-0246Thermische expansie tankleidingenClose-out93%
  • PRJ-0027Lighting replacementExecution0%
  • PRJ-0034Tank cooling (and fire extinguishing) systeInitiation0%
  • PRJ-0028Cable tray renewalExecution45%
  • PRJ-0158Fire proofing of structuresClose-out100%
  • PRJ-0166Camera system replacementExecution40%
  • PRJ-0038Crane overhaulClose-out0%
  • PRJ-0020Cable tray renewalClose-out100%
  • PRJ-0151Fire water pump repairExecution71%
  • PRJ-0024Renovation marine loading armsClose-out0%
  • PRJ-0167Lifting equipment inspectionInitiation0%
  • PRJ-0235Lighting replacementInitiation0%
  • PRJ-0018Oxygen monitoring installationDefinition0%
  • PRJ-0165Loading arm renovationPreparation0%
  • PRJ-0150Camera system replacementExecution35%
  • PRJ-0159Cathodic protection upgradeClose-out0%
  • PRJ-0238Off-site line inspectionClose-out0%
  • PRJ-0011Fire water pump repairInitiation0%
  • PRJ-0147Ensure reliable waste water processExecution0%
  • PRJ-0236Cable tray renewalExecution0%
  • PRJ-0244Pit 6 N2 incl. permanente zuurstofbewakinExecution0%
  • PRJ-0155Foundation repairsInitiation0%
  • PRJ-0014Fire proofing of structuresDefinition0%
  • PRJ-0021Jetty repairClose-out60%
  • PRJ-0036Preventive maintenance backlogClose-out0%
  • PRJ-0025Replace parts of cable trays on main cablePreparation0%
  • PRJ-0065TK 1401: (Out-of-service) inspection & TTARExecution20%
  • PRJ-0069TK 1706: (Out-of-service) inspection & TTARClose-out60%
  • PRJ-0016TK 1712 - roof drain replacementInitiation100%
  • PRJ-0030SHEQ ImprovementInitiation0%
  • PRJ-0237TK 703 - bottom plate renewalPreparation0%
  • PRJ-0023Emergency shower replacementInitiation0%
  • PRJ-0015Gas detection installationExecution0%
  • PRJ-0172TTAR Tank 309Initiation100%
  • PRJ-0081Tk 1107: (Out-of-service) inspection & TTARExecution60%
  • PRJ-0017TK 1802 - bottom plate renewalClose-out70%
  • PRJ-0033TK 402 - floating roof seal replacementInitiation100%
  • PRJ-0082Tk 1108: (Out-of-service) inspection & TTARExecution70%
  • PRJ-0083Tk 1109: (Out-of-service) inspection & TTARExecution20%
  • PRJ-0162Painting tanksClose-out0%
  • PRJ-0240Painting tanksInitiation0%
  • PRJ-0088Tk 2914: (Out-of-service) inspection & TTARExecution70%
  • PRJ-00132019 Replacement LS distribution cabinetsExecution0%
  • PRJ-0019HeatwaveExecution0%
  • PRJ-0163Foundation repairsExecution0%
  • PRJ-0064TK 1110: (Out-of-service) inspection & TTARExecution70%
  • PRJ-0084Tk 1111: (Out-of-service) inspection & TTARExecution30%
  • PRJ-0085Tk 1115: (Out-of-service) inspection & TTARExecution40%
  • PRJ-0153Bund wall repairsExecution0%
  • PRJ-0055Replacement PMSX / PLC'sExecution70%
  • PRJ-0091Nitrogen blanketingExecution70%
  • PRJ-0037Loading arm renovationExecution84%
  • PRJ-0077Tk 1101: (Out-of-service) inspection & TTARExecution50%
  • PRJ-0078Tk 1103: (Out-of-service) inspection & TTARExecution60%
  • PRJ-0079Tk 1105: (Out-of-service) inspection & TTARExecution70%
  • PRJ-0080Tk 1106: (Out-of-service) inspection & TTARExecution50%
  • PRJ-0043Lighting replacementExecution0%
  • PRJ-0042CP Upgrade off-site PipelinesPreparation0%
  • PRJ-0173Level measurement replacementInitiation0%
  • PRJ-0250Terminal automation upgradeInitiation0%
  • PRJ-0075Tank cooling (and fire extinguishing) systemsExecution93%
  • PRJ-0271Tank cooling (and fire extinguishing) systemsInitiation100%
  • PRJ-0052Sewer renovationExecution42%
  • PRJ-0073TK 311: (Out-of-service) inspection & TTARClose-out50%
  • PRJ-0092Actuator replacementClose-out0%
  • PRJ-0095Updaten en aanvullen P&ID's en C&E'sExecution0%
  • PRJ-0185Replacement HV panel Inkoop stationExecution0%
  • PRJ-0187SHEQ improvement budgetInitiation0%
  • PRJ-0188Cable tray renewalExecution0%
  • PRJ-0196Painting and coating programmeInitiation0%
  • PRJ-0199Updaten en aanvullen P&ID's en C&E'sExecution0%
  • PRJ-0249Mixer overhaulExecution0%
  • PRJ-0251Out-of-service inspection and repairInitiation0%
  • PRJ-0262Replace camera systemClose-out0%
  • PRJ-0264Replacement Lighting workplacesInitiation86%
  • PRJ-0265SHEQ improvement budgetExecution0%
  • PRJ-0267Lighting replacementExecution0%
  • PRJ-0275Updaten en aanvullen P&ID's en C&E'sExecution0%
  • PRJ-0276Actuator replacementInitiation0%
  • PRJ-0239Maintenance charge to capexInitiation0%
  • PRJ-0193Tank cooling (and fire extinguishing) systemsInitiation100%
  • PRJ-0179On-site pipeline maintenanceClose-out0%
  • PRJ-0257On-site pipeline maintenanceClose-out0%
  • PRJ-0089VRB turnaround planExecution0%
  • PRJ-0160Maintenance charge to capexInitiation0%
  • PRJ-0191TK 902: (Out-of-service) inspection & TTARExecution20%
  • PRJ-0045Loading arm renovationClose-out0%
  • PRJ-0047On-site pipeline inspectionExecution0%
  • PRJ-0177Pump overhaulExecution47%
  • PRJ-0178On-site pipeline inspectionExecution0%
  • PRJ-0253Loading arm renovationInitiation0%
  • PRJ-0256On-site pipeline inspectionExecution0%
  • PRJ-0048On-site pipeline maintenanceExecution0%
  • PRJ-0056Replacement underground firewater pipelinesExecution0%

First 120 shown. Narrow with a name or a tile above.