On the plan

1326

214 running today · as at 25 Jul 26

Overdue

37

Read byKindProgrammeEquipment typeEquipmentWindow18 months ahead

26 Apr 2616 Jan 28

What
Bund and drip tray inspection22
Bund and drip tray inspection22
Condition inspection4
Condition inspection4
External inspection434
External inspection434
Fall protection and safety check24
Fall protection and safety check24
Loading arm inspection24
Loading arm inspection24
Meter verification12
Meter verification12
Motor and switchgear inspection18
Motor and switchgear inspection18
Process check32
Process check32
Pump and seal inspection36
Pump and seal inspection36
Roof seal and drain check434
Roof seal and drain check434
Structural survey12
Structural survey12
Capex projects194
Level measurement replacement
Pump overhaul
Replacement SCADA / PLC
Replace flowmeter/computer LP7
Water treatment phase 1 HAZOP actions
Camera system replacement
Off-site pipeline inspection off-site line
Motor control centre replacement
E Drawings & Contractor housing
Maintenance activities offices and building
Replacement MOV actuators 2018
Gas detection installation
Replacement MCC's pump rooms
Low-voltage distribution cabinet replacement
Reparaties schuim en sprenklerleidingen
Reparaties manifolds
Operating computer replacement
Mechanical modifications during TTAR
Sewer renovation
Cable tray renewal
Hydrant replacement
On-site pipeline maintenance
Pipework replacement
Tank cooling (and fire extinguishing) syste
Thermische expansie tankleidingen
Vapour recovery modification
Waste water process improvement
Lighting replacement
Tank cooling (and fire extinguishing) syste
Cable tray renewal
Camera system replacement
Fire proofing of structures
Crane overhaul
Cable tray renewal
Fire water pump repair
Lifting equipment inspection
Lighting replacement
Renovation marine loading arms
Loading arm renovation
Oxygen monitoring installation
Camera system replacement
Cathodic protection upgrade
Off-site line inspection
Cable tray renewal
Ensure reliable waste water process
Pit 6 N2 incl. permanente zuurstofbewakin
Foundation repairs
Fire proofing of structures
Jetty repair
Preventive maintenance backlog
Replace parts of cable trays on main cable
SHEQ Improvement
Emergency shower replacement
Gas detection installation
Painting tanks
Painting tanks
2019 Replacement LS distribution cabinets
Heatwave
Foundation repairs
Tank cooling (and fire extinguishing) systems
Bund wall repairs
Replacement PMSX / PLC's
Nitrogen blanketing
Loading arm renovation
Lighting replacement
CP Upgrade off-site Pipelines
Level measurement replacement
Terminal automation upgrade
Tank cooling (and fire extinguishing) systems
Actuator replacement
Actuator replacement
Cable tray renewal
Fire water pump repair
Hydrant replacement
Lighting replacement
Painting and coating programme
Preventive maintenance backlog
Replace camera system
Replacement HV panel Inkoop station
Replacement Lighting workplaces
Sewer renovation
SHEQ improvement budget
SHEQ improvement budget
SHEQ improvement budget
Updaten en aanvullen P&ID's en C&E's
Updaten en aanvullen P&ID's en C&E's
Updaten en aanvullen P&ID's en C&E's
Tank cooling (and fire extinguishing) systems
On-site pipeline maintenance
On-site pipeline maintenance
VRB turnaround plan
Loading arm renovation
Loading arm renovation
On-site pipeline inspection
On-site pipeline inspection
On-site pipeline inspection
Pump overhaul
On-site pipeline maintenance
Replacement underground firewater pipelines
Actuator replacement
Pump overhaul
Oxygen monitoring installation
Concrete repairs to roads and hardstanding
Emergency shower replacement
Gas detection installation
Sewer renovation
Study and front-end engineering
Lifting equipment inspection
Terminal automation upgrade
Insulation renewal
Loading arm renovation
Hydrant replacement
Level measurement replacement
Painting and coating programme
Retaining wall repairs
Motor control centre replacement
Lighting replacement
Cable tray renewal
Hydrant replacement
Crane overhaul
Tank cooling (and fire extinguishing) systems
Portfolio contingency
Building maintenance
High-voltage panel replacement
Off-site line section replacement
Preventive maintenance backlog
Fire water pump repair
Preventive maintenance backlog
Tank cooling (and fire extinguishing) systems
Tank cooling (and fire extinguishing) systems
Loading arm renovation
Loading arm renovation
Mixer Tank 207
Foundation repairs
Stair and handrail renewal
Mod Fire Proofing lines and cable sleeves/penetrations
Mod Fire Proofing pipe and cable sleeves / penetrations
Mod Fire Proofing pipe and cable sleeves/penetrations
Pipework replacement
Bund wall repairs
Off-site line In-line inspection & section replacement
Pipework replacement
Closed pigcatcher system
Sewer renovation North & South
Install lifting equipment manifold bay
Bundwalls
Civil repairs roads-pavements
Fence renewal
Cable tray renewal
Gas detection installation
High-voltage panel replacement
Jetty repair
Access control high/low voltage stations
Access control high/low voltage stations
Install PT's external pipelines
Install PT's external pipelines
Install PT's external pipelines
Contractor housing
Replace PT's incl. B&B valve
Replacement LV distribution cabinets
Replacement underground firewater pipelines
Actions out of HAZOP
Cable tray renewal
Camera system replacement
Concrete plates rail
Fence repair
Fire water pump repair
Gas detection installation
Hydrant replacement
Lifting equipment inspection
Maintenance activities offices and buildings
Maintenance Activities Offices and Buildings
On-site pipeline maintenance
Painting and coating programme
Pig catcher replacement
Pig catcher replacement
Pipe sleeves/penetrations replacement
Renovation marine loading arms
Replace tourniquet
Replacement P8 water treatment
SHEQ improvement budget
Stairways and handrailing adjust/add
Study N2 buffering
Waste water process improvement
Retaining wall repairs
Civil repairs roads-pavements
Concrete repairs to roads and hardstanding
Earthing structures and pipelines
Retaining wall repairs
Repl. Part wastwatersewer pipelines
Earthing and bonding survey
Replace flowtransmitters jetty -02
Replacement underground firewater pipelines
Replacement MCC's pump rooms
Major tank maintenance80
Tank 2101: Inspection + Repair +Maintenance
TK 1401: (Out-of-service) inspection & TTAR
TK 1706: (Out-of-service) inspection & TTAR
TK 1712 - roof drain replacement
TK 703 - bottom plate renewal
TTAR Tank 309
Tk 1107: (Out-of-service) inspection & TTAR
Tk 1108: (Out-of-service) inspection & TTAR
Tk 1109: (Out-of-service) inspection & TTAR
TK 1802 - bottom plate renewal
TK 402 - floating roof seal replacement
Tk 2914: (Out-of-service) inspection & TTAR
TK 1110: (Out-of-service) inspection & TTAR
Tk 1111: (Out-of-service) inspection & TTAR
Tk 1115: (Out-of-service) inspection & TTAR
Tk 1101: (Out-of-service) inspection & TTAR
Tk 1103: (Out-of-service) inspection & TTAR
Tk 1105: (Out-of-service) inspection & TTAR
Tk 1106: (Out-of-service) inspection & TTAR
TK 904: (Out-of-service) inspection & TTAR
Mixer overhaul
Out-of-service inspection and repair
TK 311: (Out-of-service) inspection & TTAR
TK 902: (Out-of-service) inspection & TTAR
TK 204: (Out-of-service) inspection & TTAR
Tk 501: (Out-of-service) inspection & TTAR
TK 1104: (Out-of-service) inspection & TTAR
In service (On Stream) Inspections
In Service (On Stream) Inspection
Uitwendig conserveren tankdak 501
TK 511: (Out-of-service) inspection & TTAR
TK 1903 - vent valve replacement
Tk 1407: (Out-of-service) inspection & TTAR
TK 305: (Out-of-service) inspection & TTAR
TK 505: (Out-of-service) inspection & TTAR
TK 301: (Out-of-service) inspection & TTAR
TK 1608: (Out-of-service) inspection & TTAR
TK 0407: (Out-of-service) inspection & TTAR
TK 805: (Out-of-service) inspection & TTAR
TK 1404: (Out-of-service) inspection & TTAR
Tk 1709: (Out-of-service) inspection & TTAR
TK 0803: (Out-of-service) inspection & TTAR
TK 1610: (Out-of-service) inspection & TTAR
TK 1710: (Out-of-service) inspection & TTAR
TK 2934: (Out-of-service) inspection & TTAR
TK 0113: (Out-of-service) inspection & TTAR
TK 0208: (Out-of-service) inspection & TTAR
TK 0608: (Out-of-service) inspection & TTAR
TK 1905 - out-of-service inspection and repair
Install IDDTK 708-809-810
TK 0903: (Out-of-service) inspection & TTAR (-19 CO)
TK 0504: (Out-of-service) inspection & TTAR
Tk 1806: (Out-of-service) inspection & TTAR
TK 406 - roof drain replacement
In Service (On Stream) Inspections
Install floating roof seals'TK 708/809/810
TK 1604: (Out-of-service) inspection & TTAR
TK 1906 - floating roof seal replacement
TK 1907 - shell plate repairs
TK 2005: On-Stream inspection
TK 310 - internal coating renewal
TK 0202: (Out-of-service) inspection & TTAR
TK 0115: (Out-of-service) inspection & TTAR
TK 0214: (Out-of-service) inspection & TTAR
Tk 0215: (Out-of-service) inspection & TTAR
TK 0502: (Out-of-service) inspection & TTAR
TK 0505: (Out-of-service) inspection & TTAR
TK 0314: (Out-of-service) inspection & TTAR
Tk 0317: (Out-of-service) inspection & TTAR
TK 0910: (Out-of-service) inspection & TTAR
TK 0307: (Out-of-service) inspection & TTAR
TK 0312: (Out-of-service) inspection & TTAR
TK 1807: (Out-of-service) inspection & TTAR
TK 1612: (Out-of-service) inspection & TTAR
TK S3: (Out-of-service) inspection & TTAR
TK 0209: (Out-of-service) inspection & TTAR
TK 1316: (Out-of-service) inspection & TTAR
TK 2202: (Out-of-service) inspection & TTAR
TK 1805: (Out-of-service) inspection & TTAR
TK 0909: (Out-of-service) inspection & TTAR
2026
2027
2028
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
PM plans Capex projects Major tank maintenance a window, not a datepreventive calls due that month overdue runs on past the edge today, 25 Jul