Replace mechanical seal — Feed Water Pump P-101
H. Al-Rashid · Engineer · 6h needed
Gearbox inspection — Conveyor drive
E. van den Berg · Planner · Material slipped — pull it
34h scheduled vs 24h capacity
+10h over — mechanical
Valve overhaul — Main Isolation Valve VLV-301
J. de Boer · Engineer · 4h needed
Motor alignment — Compressor Drive Motor MOT-402
L. de Vries · Planner · Isolation not confirmed
Vibration check — Reciprocating Compressor COMP-502
A. Kowalski · Engineer · Waiting 3 days
Scaffold removal — Reactor area
H. Al-Rashid · Engineer · 3h needed
Statutory inspection — Reactor Vessel V-201
J. de Boer · Planner · Prep won't be ready
30h scheduled vs 24h capacity
+6h over — E&I
Lubrication route — Utilities area
L. de Vries · Engineer · 2h needed
Seal replacement — Pump P-9
A. Kowalski · Engineer · No target day given · 4h
Actuator service — Valve VLV-88
J. de Boer · Engineer · Waiting 5 days for a slot
3 jobs blocked on permits — can't schedule yet
Planning · Permits pending in area C